PV-15T19S Product Manual
Release time:
2023-08-10 13:33
Source:
PV-15T19S Product Instruction
Thankyou for choosing our PV junction boxes which produced by Zhejiang Forsol Energy Co.,Ltd.To enable you to correct, fast and safe use of the product, please read this Instructionscarefullybefore using.
1.The product structure and size:

2.The technical parameters:
Rated impulse voltage: 16000V DC
Rated voltage: 1500V
Rated current: 20A
Safety class: Class II
Cable range: 4mm2
Temperature range: -40oC﹣+85oC
Protection class: IP68
Flammability rating: UL94-V0
3. The installation Notes:
① Before the formal installation of the junction box, it should first confirm that thePV module is not in working condition.If it must be installed in the sunlight, please use a sun shield covering the PV moduleto avoid current and cause an electrical shock.The body can not contact the positive and negativeto simultaneously of the connector to avoid electric shock.
② Before using, the Junction box cover is loose, after the wiring is completed to ensure the junction box cover seal.
③The positive and negative of terminals and cables are clearly defined,users can not reverse polarity,doing so may result in serious consequences.
④ If you want to perform system maintenance, make sure that the system is stopped before performing.
⑤Don't put on the box, the connector and the cable to exert a force or weight.TheCable can withstand the tension is less than 400N.
⑥ It is recommended to use off alcohol and acetone siliconegel. If you use Oxime silicone, in the process of production and storage, must make the 2-butanone oxime insilicone volatile out completely, otherwise it may result in the crack of the plastic parts, metal parts as well as the corrosion phenomenon.
4.Installation and usage:
The shaded area is silicone coated area Bus-bar welding
The amount of glue Cover assembly sequence

1、As shown in FIG1 shaded area is silica coated area, Daub way for the reinforcement of sealant with the silica gel, after being a turns along the reinforcement of sealant to press the bottom box into back on. .
2、Make the Bus-bar through the hole on the connection plate from the base bottom, and then use the handle of the electric iron bars welded (with tin welding), check the reliability of welding after it.
3、As shown in figure 3 to fill the glue into each junction box (10 ml for left and right, 8.5 ml for middle)
4、As shown in Figure 4, after filling the glue, the bottom box needs to be placed in a cool place to wait for the glue to solidify, and the upper cover can be covered after solidification. The upper cover first buckles the bottom buckle (as shown in Figure 5), and then buckles the left and right buckles (Figure 6).
5、How to open the lid: The lid needs to be opened, take a flat-blade screwdriver (as shown in Figure 7), and open the lid from the side door (see Figure 8).